The Impact of Performance Factors on Performance on Quality in Project Implementation

Authors

  • Hermawan Tedi Universitas Mercu Buana
  • Oktavia Futri Fajarni Universitas Mercu Buana
  • Aminudin Universitas Mercu Buana
  • Marpaung Richo Ronald Universitas Mercu Buana
  • Iman Darul Universitas Mercu Buana
  • Acep Hidayat Universitas Mercu Buana

DOI:

https://doi.org/10.61987/jemr.v4i2.1024

Keywords:

Performance Factors, Managerial Competence, Work Experience , Communication

Abstract

This study aims to analyze the impact of various performance factors on contractor performance in the implementation project, as part of the National Police's institutional transformation toward a predictive, responsive, and transparent work system. The performance factors analyzed include managerial competence, work experience, communication, and time management. Using a questionnaire and Partial Least Square (PLS) analysis, the study finds that managerial factors (P-value 0.000) and occupational safety and environment (K3L) (P-value 0.016) significantly influence contractor performance. However, legal and licensing, financial, technical, and social aspects do not show significant effects. The study suggests focusing on improving managerial training and enhancing K3L standards, while also maintaining compliance with licensing and social relationships. This research highlights the importance of management and safety training in educational settings to improve professional performance in construction projects.

References

Ali, A., Amin, M., & Husin, A. E. (2019). Key Success Factors for Safety Programs Implementation in Indonesian Construction Projects. Int. J. Civ. Eng. Technol, 10(2), 1385–1394.

Andreamara, Abizar, E., Fadhlurrohman, H., Adhinitama, B., Kusuma, A., Isradi, M., & Amin, M. (2025). Analysis of Consultant Performance Satisfaction in Construction Projects : A Case Study of the ABC Supermarket Project in Jakarta. International Journal of Scientific Engineering and Science, 9(6), 42–48.

Erlita, A., Amin, M., & Bintoro, B. P. K. (2023). Multiphase Project Risk Management on Food Factory Building Construction: Consultant Perspective. Journal of Construction in Developing Countries, 28(1), 1–17.

Irfan Rifai, A., Fazadi Rafianda, D., Isradi, M., & Mufhidin, A. (2021). Analysis Of Customer Satisfaction On The Application Of The Covid-19 Protocol At The Inter-City Bus Terminal. International Journal of Engineering, Science and Information Technology, 1(1), 75–81. https://doi.org/10.52088/ijesty.v1i1.107

Isradi, M., Stini, L. O., Dermawan, W. B., & Mufhidin, A. (2021). Analysis of Customer Satisfaction on Service Quality of KRL Bogor - Jakarta. IJTI (International Journal of Transportation and Infrastructure), 5(1), 14–25.

Karimi, S., & Piroozfar, P. (2022). Exploring Causes of Delays in National Road and Highway Projects in Developing Construction Economy. Journal of Engineering, Project, and Production Management, 12(2), 137–148. https://doi.org/10.32738/JEPPM-2022-0013

Neva, K., & Assa, A. F. (2025). The impact of Service Quality on Loyalty Through Satisfaction as a Mediating Variable. Journal of Educational Management Research, 04(02), 348–362. https://doi.org/10.61987/jemr.v4i2.908

Nova, A., Muhamad, R., Farras, P. S., Mutiara, J. R., Made, M., Dwi, Y. A., & Isradi, M. (2025). Performance Evaluation of Construction Consultants Using Smart-PLS and IPA. Journal of Educational Management Research, 04(03), 665–681.

Pamungkas, P. A., & Susetyo, B. (2024). Analysis of Internal and External Factors on Project Performance Based on Risk Management in Smelter Construction. ASTONJADRO, 13(2), 537–549.

Pourrostam, T., & Ismail, A. (2011). Significant Factors Causing and Effects of Delay in Iranian Construction projects. Australian Journal of Basic and Applied Sciences, 5(7), 450–456.

Rachmadina, Y., Isradi, M., Prasetijo, J., Negara Dalimunte, A. K., & Mufhidin, A. (2023). Analysis of the Choice of Commuter Line Electric Rail Train (Krl) Modes and Transjakarta Buses for the Bekasi City - East Jakarta Route. Engineering and Technology Journal, 8(08), 2655–2664. https://doi.org/10.47191/etj/v8i8.23

Rauf, R., Wulandari, L. K., & Manaha, Y. P. (2023). Performance Evaluation of Supervisory Consultants on Road Reconstruction Projects in East Kalimantan , Indonesia. 7(2), 13–17.

Sears, S. K., Sears, G. A., & Clough, R. H. (2010). Construction Project Management: A Practical Guide to Field Construction Management. John Wiley & Sons.

Shakeri, H., & Khalilzadeh, M. (2020). Analysis of Factors Affecting Project Communications with a Hybrid DEMATEL-ISM Approach (A Case Study in Iran). Heliyon, 6(8), e04430. https://doi.org/10.1016/j.heliyon.2020.e04430

Shakeri, H., Khalilzadeh, M., Asyiah, S., Maddeppungeng, A., Alfalakh, D. S., Kayelle, E., Rabbani, E. K., Macedo, M., Rauf, R., Wulandari, L. K., Manaha, Y. P., Byaruhanga, A., Basheka, B. C., Setyo, M., Muhammadun, H., Oetomo, W., & Sufiyati, Sofia, M. (2022). Contractor Monitoring and Performance of Road Infrastructure Projects in Uganda: A Management Model. Journal of Management and Sustainability, 1(2), 30–44. https://doi.org/10.36055/jft.v9i2.9002

Stevenson, W. J. (2012). Operations Management. New York: McGraw-Hill/Irwin.

Susetyo, B., Budinata, T., & Bintoro, B. P. K. (2021). Relationship Quality Performance, Rework and Worker Productivity with Customer Satisfaction on Housing Development Project. Int. J. of Sci. & Tech. Research, 10, 24–27.

Downloads

Published

2025-07-08

How to Cite

Tedi, H., Fajarni, O. F., Aminudin, Ronald, M. R., Darul, I., & Acep Hidayat. (2025). The Impact of Performance Factors on Performance on Quality in Project Implementation . Journal of Educational Management Research, 4(2), 697–709. https://doi.org/10.61987/jemr.v4i2.1024

Issue

Section

Articles